Our projects are the testimony of are technical excellence and dedicated approach to project completion

Irrigation and Water Supply

The scope of work in our irrigation projects varies from project to project. The activities that we undertake are usually impounding the reservoir, construction of water conducting system and canals. Aware of the growing opportunity in developing agricultural infrastructure through lift irrigation, we have recently entered into Lump Sum Turnkey execution of lift-irrigation Project.

  • Latratu Spillway
  • Location:- Karra,Distt- Ranchi, Jharkhand
  • Client:- Water Resources Dept, Govt of Bihar
  • Length Of Spillway:- 250m, No of Spans:- 25

  • Latratu Dam
  • Location:- Karra,Dt- Ranchi, Jharkhand
  • Client:- Water Resources Dept,Govt of Bihar
  • Length Of Dam:- 2.4 km
  • Height Of Dam:- 38 m

  • Paras Spillway
  • Location:- Bharno,Ranchi Gumla Road, Jharkhand
  • Client:- Water Resources Dept, Govt of Bihar
  • Length Of Spillway:- 200m, No of Spans:- 20

  • Fatehpur Barrage
  • Location:- Fatehpur,Dist- Gaya, Bihar
  • Client:- Water Resources Dept, Govt of Bihar
  • Length Of Barrage:- 250m, No of Spans:- 27

  • Tapkara Dam
  • Location:- Tapkara,Dist- Gumla, Jharkhand
  • Client:- Water Resources Dept, Govt of Bihar
  • Length Of Dam:- 1.90 km
  • Height Of Dam:- 24 m
  • DhansingToli Dam
  • Location:- Konebir,Dist- Gumla, Jharkhand
  • Client:- Water Resources Dept, Govt of Bihar
  • Length Of Dam:- 2.600 km:- 33 m

  • Durgawati Spillway
  • Location:- Karamchat,Dist- Rohtas,Bihard
  • Client:- Water Resources Dept, Govt of Bihar
  • Length Of Spillway:- 100 m
  • Height Of Spillway:- 55 m, No of Spans:- 3 m

  • PunPun Barrage
  • Location:- Hamidnagar, Goh Dist-Gaya, Bihar
  • Client:- Water Resources Dept, Govt of Bihar
  • Length Of Barrage:- 300 m

  • Sevhi Branch cannal
  • Location:- Gujarat
  • Client:- Sardar Sarovar Narmada Nigam Ltd.
  • Length Of Barrage:- 20 km
  • Ramrekha Project
  • Location:- Ramrekha, Dist-Simdega, Jharkhand
  • Client:- Water Resources Dept, Govt of Jharkhand.
  • The project is awarded on turnkey basis covering construction of Dam, Spillway, Outlet,Canals etc.

  • Bhairwa project
  • Location:- Gola, Dist-Hazaribagh, Jharkhand
  • Client:- Water Resources Dept, Govt of Jharkhand
  • The project is awarded on turnkey basis covering construction of Dam, Spillway, Outlet, Canals etc.

  • Storm Water Drainage
  • Location:- Roukella ,Orissa
  • Client:- Rourkella Steel plant(SAIL)
  • Length:- 30 km

Railways

  • Railway Track
  • Location:- Dehri (Bihar)
  • Client:- Eastern Railway
  • Length:- 6 km

  • Railway Track
  • Location:- Koderma (Jharkhand)
  • Client:- Eastern Railway
  • Length:- 22 km

  • Kokan Railways
  • Location:- Khaird, Dist-Rathnagiri, Maharastra
  • Client:- Kokan Railways
  • Works:- 30 kms Embankment Construction including bridges and C.D. works in Bombay-Goa Rail Link.

  • Tunnel Works
  • Location:- Banaso, Dist:- Hazaribagh, Jharkhand
  • Client:- Konar Irrigation project
  • Length:- 2.85 kms
  • Dia:- 5 m

Mining & Buildings

  • Coal Mine Excavation (open-cast)
  • Location:- Sikni (Jharkhand)
  • Client:- Bihar Mineral Development Corporation
  • Removal of overburden and excavation of Coal

  • Jharkhand High Court

  • Cambriam Public School

 

Road

  • Development of State Highway in Bihar (Gaya-Daudnagar Road) (SH-7)
  • Total Length:- 70.5 KMS
  • Location:- Gaya
  • Client:- CPWD
  • Development of State Highway in Bihar (Gaya-Hulasganj Road) (SH-4)
  • Total Length:- 35.5 KMS
  • Location:- Gaya
  • Client:- CPWD
  • Development of State Highway in Bihar (Kudra-Chenari-Shivsagar Road) (SH-67)
  • Total Length:- 41 KMS
  • Location:- Sasaram
  • Client:- CPWD
  • BPDP Project
  • Location:- Bakaspur, Namkum, Karra, Kelebera, Baro, Sunderpahari, Bhandaria, Barhait, in Jharkhand.
  • Client:- Bihar Plateau Devlopment Authority(World Bank Aided)
  • Road Work:- Total road Construction 210.00 km on above mentioned Places.
  • Bridge Works:- 1200 m of Double Lane
  • 400 m of Single Lane

Water Treatment and Pipeline

  • Water Supply Scheme
  • Location : Munger Bihar
  • Client : PHED

Current Projects

  • Construction of Barrage including Outlets and Afflux Bun
    Client: Water Resources Dept, Govt of Bihar
  • Constuction of Bhairwa Reservior Scheme (Residual Work) in Hazaribagh Dist (Jharkhand) on Turn-Key Basis
    Client: Water Resources Dept, Govt of Jharkhand
  • Construction of Formation (Filling and Cutting), Retaining Walls, Blanketing along with other ancillary items associated with Railway Infrastructure Works for Maithon Power Limited- Phase 1
    Client: Tata Power
  • Construction of Minor Bridges associated with Railway Infrastructure Works for Maithon Power Limited- Phase 1
    Client: Tata Power
  • Construction of Bridges (Pak4A) in Gaya Ullasganj road(SH-4)
    Client: CPWD
  • Construction of 500 beded in Sadar Hospital along with Doctors Hostel, Nurse Hostel, Type 3, Type 4, Type 2 Residences, Ranchi
    Client: NBCC
  • Know More »